Select the language by clicking the flag

language=en language=fi language=se
logo

Diary of Installation of a Moisture Isolation

Implementation of supervision for personnel certification for various operations

DATA OF INFORMER:

Fields marked with asterisk are obligatory
Name: *
Tel: *
E-mail:
Name of the housing co-operative or the address: *
Apartment: *
Installation time: *
Constractors, names and tel. numbers: *
Supervisor and tel. number: *
Workman of moisture isolation: *
Certification number of the workman: *
Wet rooms, amount or area: *
Floor area:
Wall area:
Base floor material: *
Base wall material: *
 
Surface structure with trade marks
Filler: *
Primer: *
Moisture isolation: *
Well types and flanges: *
Reinforcement of the moisture isolation: *
Adhesive: *
Tiles: *
Grout: *
Bushing products: *
Elastics seams: *
 

Measurements (result and apartment)

Consumption wall/apartment, measured: * Result kg/m²: *
Consumption floor/apartment, measured: * Result kg/m²: *
Film thickess on walls, measured: * Result mm: *
Film thickess on floor, measured: * Result mm: *
Concrete moisture %: *
Concrete age months: *
Floor gradient: *
Air Temperature: *
Floor heating: *
Guide has been delivered to the workman: Yes No
Notes if any:
What month comes after July? ¹ *
¹ Why we are asking this?
There are a lot of robots who are looking for security holes in systems using these forms. If such a revision did not exist, we would get every day dozens or even hundreds of empty emails.